How to write a construction quote
- Add your company name and contact, and your logo if you have one.
- Name the client and the job exactly as they will recognise it, including the site address.
- List the work as line items with a quantity, unit and rate. Group them under headings such as Demolition, Framing or Finishes.
- Set your markup (built into the rates, so the client sees one price per line) and the tax that applies where you work.
- Write your terms: deposit, payment stages, what is excluded and how long the price holds. Then download the PDF and send it.
What every construction quote should include
A scope the client can check line by line, with quantities and units rather than one lump sum. Clear exclusions, because most disputes start with something the client assumed was included. Your payment terms and stages. How long the price is valid, since material prices move. And who you are: business name, licence or registration number where your state requires it, and how to reach you.
Quote or estimate?
An estimate is your best guess and can change. A quote is a fixed price for the scope you described, and in many places it is binding once accepted. If the scope is uncertain, quote what you can see and list the unknowns as provisional sums or exclusions rather than padding the price.
Markup versus margin
Markup is added to cost; margin is the share of the price you keep. A 25% markup on $1,000 of cost gives a $1,250 price, which is a 20% margin, not 25%. Decide which one your overheads and profit target are set in, and use it consistently, because mixing them up quietly underprices every job.
If you price from plans, the quantities can come from the drawings with AI estimating that starts at the takeoff.
Questions
Is this construction quote builder free?
Yes. Building the quote and downloading the PDF are free with no account. The PDF carries a small "made with ContractorCounter" mark.
Is my quote saved?
Your draft is kept in this browser so a refresh does not lose it. It is not stored on a server, so clearing your browser data removes it.
Can I add GST or VAT?
Yes. Choose GST, VAT or sales tax and set the rate; the tax is shown on its own line and in the total.
Will the client see my markup?
No. Markup is built into each rate, so the client sees one price per line and never a separate markup figure.
Can I quote straight from drawings?
Not in this builder: you type the quantities. In ContractorCounter you measure the PDF plans and the quantities flow into the quote.